-
Material & Services:
Engineering, fabrication and installation of the steel–cablenet roof with membrane cladding, with 970 tons of cable net and 35.000 m² PTFE membrane
partly highly translucent
-
Construction Period:
2017-2021
-
Owner:
Supreme Committee for Delivery and Legacy
-
Client:
Tekfen – Al Jaber JV
-
Architect:
Fenwick Iribarren Architects, Heerim Architects
-
Engineer:
Thornton Thomasetti, schlaich bergermann partner (sbp)