Skip to main content

Höchheimer Mainsteg

Margetshöchheim, Germany

Project Details

  • Material & Services:

    Engineering, fabrication and installation of structural steel bridge components

  • Construction Period:

    2022

  • Owner:

    City of Aschaffenburg

  • Client:

    Adolf Lupp GmbH & Co. KG

  • Architect:
    schlaich bergermann partner (sbp)
  • Engineer:
    schlaich bergermann partner (sbp)

Project Description

The Höchheimer Mainsteg provides an elegant crossing over the River Main, enhancing connectivity for pedestrians and cyclists while complementing the surrounding landscape. Its slender design combines structural efficiency with a refined architectural appearance, making the bridge an important element of the local infrastructure.

 

PFEIFER Structures was responsible for the fabrication and installation of the bridge’s precision-engineered steel structure and its cable suspension system. The project required meticulous manufacturing, careful handling of large steel components as well as cable elements, and efficient on-site assembly to achieve the bridge’s demanding geometric accuracy and visual quality. Through close coordination with all project stakeholders, PFEIFER Structures delivered a durable and aesthetically refined solution that meets the highest standards of modern bridge construction.